EZ INDUSTRY

Project Experience

Industrial projects carried through development, verification, inspection and shipment.

CUSTOM DEVELOPMENT CASE

COMPLETED PROJECT

Container
Custom Desiccant Development

We went beyond supplying an off-the-shelf product by designing a structure for the customer’s connector and ocean-shipping environment and supporting comparative testing.

Actual EZ INDUSTRY container desiccant productACTUAL PRODUCT · EZDRI

CLIENT

Korean industrial packaging and logistics customer

01Requirements AnalysisConfirmed the customer connector and use environment
02Custom StructureDesigned a two-row welded structure for the connector
03Sample ComparisonCompared moisture absorption and packaging condition
04Ocean Field TestSupported a seven-product field test under actual shipping conditions
2-ROWCustom welded structure
7 PRODUCTSComparative field test
ONE FLOWMaterials · packaging · samples · production

PERFORMANCE VERIFICATION

Actual Structure & Comparative Test Results

These are in-house comparative test results; performance may vary by use environment.
Two-row internal desiccant structure
01Two-row structureActual compartmentalized absorbent structure
Desiccant comparison chart at 30°C and 70% RH
0230℃ / 70% RHEZ-CM final index: approximately 221
Desiccant comparison chart at 50°C and 20% RH
0350℃ / 20% RHEZ-CM final index: approximately 153

SEMICONDUCTOR COMPONENTS

Semiconductor Wafer Rings
Actual Manufacturing & Shipment Cases

We manufacture wafer rings in various sizes and shapes to customer drawings and verify surface, micro-holes, thickness and packaging before shipment.

Wafer-ring lineup in various specifications
Custom sizes and shapes
Packaged wafer-ring product
Precision-machined product
Wafer-ring micro-hole detail
Micro-hole machining
Wafer-ring surface detail
Surface detail
Wafer-ring thickness and side machining
Thickness and side inspection
Drawing and tolerance reviewSurface and flatness controlMicro-machining inspectionIndividual packaging and shipment

DANGEROUS GOODS EXECUTION

Dangerous Chemical Goods
Pre-shipment Inspection & Loading

Before shipment, we verify packaging, dangerous-goods labels, pallet securing and container loading, then connect export documentation and international transport.

Pre-shipment inspection of dangerous-goods drum packaging
01Drum and pallet packaging inspectionShipment case: June 2025
UN2880 oxidizing-substance dangerous-goods label
02UN2880 · Class 5.1 marking verifiedOxidizing and environmental-hazard labels
Dangerous-goods container loading completed
03Container loading inspectionPallet securing and space inspection

SELECTED WORK

Proven by Results
Project Execution

01

AUTOMATION

Automation Equipment Application

We compared Chinese manufacturers against process and accuracy requirements and proposed an execution structure covering control, installation and after-sales service.

±10 mmTarget accuracy
02

CUSTOM DEVELOPMENT

Container Desiccant Solution

We developed a two-row welded structure for the customer’s connector and supported an ocean field test of seven products.

7 productsComparative field test
03

GLOBAL LOGISTICS

Integrated Import & Export Execution

We connect supplier development with PI, Invoice, Packing List, BL/AWB, COO and door-to-door delivery.

2010—Local Shanghai operations